Skip to content
Internal wall insulation — Airtightness membrane

Work

Photographed through, not after.

Insulation and airtightness are judged on detailing that disappears behind plasterboard. Every job here was photographed while it was still open, at the stage where you can see how it was built.

Three jobs, start to finish

Followed from bare masonry through to boarded out, stage by stage.

Insulation and airtightness

Walls lined in wood fibre, floors and ceilings insulated between the joists, and the whole envelope taped up behind it.

7 jobs · 21 photographs · open one for the full sequence

Solar panel systems

Anchors fixed to the rafters, rails run level off them, panels landed on the tiles.

1 job · 2 photographs · open one for the full sequence

Kitchens and renovation

Rooms taken back to the structure and rebuilt — studwork, ceilings, units, finished and in use.

3 jobs · 5 photographs · open one for the full sequence

Lofts

Boarded out for storage, with hatches and ladders that make the space reachable in practice.

3 jobs · 4 photographs · open one for the full sequence

Roofs and roofline

Roofing and chimney work — including flues filled to the top, so a disused chimney stops draining heat out of the house.

1 job · 1 photographs · open one for the full sequence

Joinery

Gates made and hung, and the smaller joinery that finishes a bigger job.

1 job · 1 photographs · open one for the full sequence

Something here look like your house?

Send a photograph of the room and one of the outside wall. That is usually enough to say what the job would involve.

Get in touch